Mehran — Petrol vs Electric
Full specs, running-cost slider, breakeven graph, installation flow, and 5-year ownership comparison based on the converted HTML logic.
Swipe sideways to view petrol and electric values
· 1,500 km / month
PKR 280/L petrol · PKR 35/kWh electricity
Petrol Mehran cost / day
1,077 PKR
Electric Mehran cost / day
219 PKR
Monthly Saving
PKR 27,945
Annual Saving
PKR 335,342
Payback
1.9 yrs
Daily Units
6.3 kWh
Cost over time — breakeven & payback
Cumulative spend over 24 months at the selected daily km. Conversion kit cost: PKR 10–11 Lac (Long Range, high-end).
EV Engineer's Note
The Mehran's lightweight body and low rotating mass make it the easiest conversion in our lineup — the 110Nm of instant torque actually makes it feel quicker off the line than stock, even with the 70–80 km/h cap. We don't recommend it for daily highway runs; it's built for in-city distances under 100km/day. If your routine includes regular motorway stretches, look at the Bolan conversion instead. — EV Square Conversion Team
What's actually inside — energy flow
How power moves from the battery pack to the wheels in the Long Range conversion.
Battery
23kWh LiFePO₄
Smart BMS
cell balancing
Controller
IP67, 72V
PMSM Motor
10kW, 110Nm
Gearbox
original, retained
Wheels
original drivetrain
Installation timeline
5–7 working days from drop-off to delivery, Long Range kit.
Day 1
Strip-down & assessment
Engine, fuel tank, exhaust, and related systems removed. Chassis inspected for mount points and corrosion.
Day 2–3
Motor & controller fitting
PMSM motor mounted to existing gearbox interface. Controller wired in, IP67 connectors sealed and tested.
Day 4–5
Battery pack installation
LiFePO₄ pack secured under rear seat / boot floor. Smart BMS wired with active cell balancing leads.
Day 6
Calibration & bench test
Drive modes (Eco/Normal/Sport) calibrated. Regenerative braking tuned. Full diagnostic run on stand.
Day 7
Road test & handover
Live road test across mixed terrain, final QC checklist signed off, handover with warranty documentation.
5-year total cost of ownership
Payback tells you when you break even. This tells you what you've actually saved by year 5 — at the daily km set on the slider above.
Petrol Mehran
5-year total
PKR 2,745,462
EV Square Electric
5-year total
PKR 1,718,750
5-year net saving
PKR 1,026,712